COMPLETED PROJECTS
Land Mark Tower L16 to L19

Client Name:
M/s. ZADCO, Abu Dhabi, U.A.E
Main Contractor:
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Project Description:
Land Mark Level 16 to Level 19
Project Strength:
This project is being done in a prestigious eye-catching building called “Landmark Tower.” The project is ‘fit-out’ works on Level 16 to Level 19. This building is located in the prominent place of Abu Dhabi City overlooking corniche beach area.
Civil Defense Centre At Abu Dhabi

Client Name :
Abu Dhabi Civil Defense
Main Contractor :
UMNIAH Facility Management
Project Description :
Refurbishment Works
Status : Completed
Completion : March - 2016
Venue-117 Live Dubai Outlet City At Al Ain Road, Dubai, UAE

Client Name :
Mr. Mohammed Naser Ali Khammas
Main Contractor :
M/s. GULF Spring Contracting, Dubai
Project Description :
Supply & Installation of Plumbing Works and Testing & Commissioning
Status : Completed
Completion : March - 2016
Hilton at Ral al Khaimah

Client Name :
RAK Hilton
Main Contractor :
Pact Engineering
Project Description :
MEP Electrical Works
Status : Completed
Completion : May- 2017

Client Name :
Polo Homes and Lapita
Main Contractor :
Green Dunes Landscape
Project Description :
Swimming Pool Works
Status : Completed
Completion : May- 2017
Polo Homes & Lapita in Dubai
Post Office Tower

Client Name :
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/s. Ali Moosa & Sons Contracting, Sharjah, U.A.E
Project Description :
3 Basements + 4 Podiums + 21 Floors + Service Roof Residential & Commercial Tower at Plot No.P5, Area W4, Abu Dhabi, U.A.E
Status : Completed
Completion : <To be filled>
Commercial Building on Plot no. C-11, Sector E-25, Abu Dhabi MEP Works

Client Name :
Dr. Engr. Mubarak Saad Al Ahbabi, Abu Dhabi, U.A.E
Main Contractor :
M/s. Arabian Construction Company (ACC), Abu Dhabi, U.A.E
Project Description :
4 Basements + Ground Floor + Mezzanine Floor + 12 Typical Floors + Mechanical/Roof Deck Floor + Gym Floor(Plant Room Level) + Roof Deck Level (Pool Deck Level) Commercial Tower at Plot No.C-11, Sector E-25, Abu Dhabi, U.A.E.
Status : Completed
Completion : <To be filled>
Emirates Palace Fire Main Line Works

Client Name :
Emirates Palace
Main Contractor :
This is a prestigious project, as the client is 5 star hotel.
Project Description :
Rectification of Existing Fire Main Line At Marine Area
Status : Completed
Completion : <To be filled>
Tamouh Testing & Commissioning of Electrical Works

Client Name :
Tamouh, Al Reem Island
Main Contractor :
China State Construction Engineering Corpn. (ME) LLC
Project Description :
Supply, Installation, Testing & Commissioning of Electrical Works due to Load increase at Tower C2, C3, C10, C10A & C11
Status : Completed
Completion : <To be filled>
Dubai, Outlet Mall Extension

Client Name :
M/s. Al Ahli Holding Group
Main Contractor :
M/s. Al Manhal Engineering Consultants & M/s. Al Ahli Holding Group
Project Description :
G+2 Parking & Service Building, Ground Floor
Status : Completed
Completion : <To be filled>
Land Mark Tower L16 to L19

Client Name:
M/s. ZADCO, Abu Dhabi, U.A.E
Main Contractor:
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Project Description:
Land Mark Level 16 to Level 19
Project Strength:
This project is being done in a prestigious eye-catching building called “Landmark Tower.” The project is ‘fit-out’ works on Level 16 to Level 19. This building is located in the prominent place of Abu Dhabi City overlooking corniche beach area.
Civil Defense Centre At Abu Dhabi

Client Name :
Abu Dhabi Civil Defense
Main Contractor :
UMNIAH Facility Management
Project Description :
Refurbishment Works
Status : Completed
Completion : March - 2016
Venue-117 Live Dubai Outlet City At Al Ain Road, Dubai, UAE

Client Name :
Mr. Mohammed Naser Ali Khammas
Main Contractor :
M/s. GULF Spring Contracting, Dubai
Project Description :
Supply & Installation of Plumbing Works and Testing & Commissioning
Status : Completed
Completion : March - 2016
Hilton at Ral al Khaimah

Client Name :
RAK Hilton
Main Contractor :
Pact Engineering
Project Description :
MEP Electrical Works
Status : Completed
Completion : May- 2017

Client Name :
Polo Homes and Lapita
Main Contractor :
Green Dunes Landscape
Project Description :
Swimming Pool Works
Status : Completed
Completion : May- 2017
Polo Homes & Lapita in Dubai
Post Office Tower

Client Name :
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/s. Ali Moosa & Sons Contracting, Sharjah, U.A.E
Project Description :
3 Basements + 4 Podiums + 21 Floors + Service Roof Residential & Commercial Tower at Plot No.P5, Area W4, Abu Dhabi, U.A.E
Status : Completed
Completion : <To be filled>
Commercial Building on Plot no. C-11, Sector E-25, Abu Dhabi

Client Name :
Dr. Engr. Mubarak Saad Al Ahbabi, Abu Dhabi, U.A.E
Main Contractor :
M/s. Arabian Construction Company (ACC), Abu Dhabi, U.A.E
Project Description :
4 Basements + Ground Floor + Mezzanine Floor + 12 Typical Floors + Mechanical/Roof Deck Floor + Gym Floor(Plant Room Level) + Roof Deck Level (Pool Deck Level) Commercial Tower at Plot No.C-11, Sector E-25, Abu Dhabi, U.A.E.
Status : Completed
Completion : <To be filled>
Emirates Palace

Client Name :
Emirates Palace
Main Contractor :
This is a prestigious project, as the client is 5 star hotel.
Project Description :
Rectification of Existing Fire Main Line At Marine Area
Status : Completed
Completion : <To be filled>
Tamouh, Al Reem Island

Client Name :
Tamouh, Al Reem Island
Main Contractor :
China State Construction Engineering Corpn. (ME) LLC
Project Description :
Supply, Installation, Testing & Commissioning of Electrical Works due to Load increase at Tower C2, C3, C10, C10A & C11
Status : Completed
Completion : <To be filled>
Dubai, Outlet Mall Extension


Client Name :
M/s. Al Ahli Holding Group
Main Contractor :
M/s. Al Manhal Engineering Consultants & M/s. Al Ahli Holding Group
Project Description :
G+2 Parking & Service Building, Ground Floor
Status : Completed
Completion : <To be filled>
New Office Fitout at Warfa Square, Abu Dhabi

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
ADDC Refurbishment works at Mussafah, Abu Dhabi

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
MEP works at Amphitheatre, Dubai

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Pipeline Mechanical Works at Haliba Development Project, UAE

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Bank One Tower, Abu Dhabi, UAE

Client Name :
FIRST ABU DHABI BANK ONE TOWER
Main Contractor :
<To be filled>
Project Description :
SUPPLY AND INSTALLATION OF WATER PUMP BOOSTER
Status : Completed
Completion : <To be filled>
Crystal Tower, Abu Dhabi

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Emirates Tower, Abu Dhabi

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Crescent Tower

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Moon Tower

Client Name :
<To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Palm Oasis

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Dune Tower

Client Name :
<To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Mirage Tower

Client Name :
<To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Buliding No: P/105 (G+O+12F) ADCP, Abu Dhabi

Client Name :
Abu Dhabi Commercial Properties
Main Contractor :
Abu Dhabi Commercial Properties
Project Description :
Building No: P/105 (G+O+12F) General Maintenance
Status : Completed
Completion : <To be filled>
Land Mark Tower L16 to L19

Client Name:
M/s. ZADCO, Abu Dhabi, U.A.E
Main Contractor:
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Project Description:
Land Mark Level 16 to Level 19
Project Strength:
This project is being done in a prestigious eye-catching building called “Landmark Tower.” The project is ‘fit-out’ works on Level 16 to Level 19. This building is located in the prominent place of Abu Dhabi City overlooking corniche beach area.
Civil Defense Centre At Abu Dhabi

Client Name :
Abu Dhabi Civil Defense
Main Contractor :
UMNIAH Facility Management
Project Description :
Refurbishment Works
Status : Completed
Completion : March - 2016
Venue-117 Live Dubai Outlet City At Al Ain Road, Dubai, UAE
Hilton at Ral al Khaimah

Client Name :
RAK Hilton
Main Contractor :
Pact Engineering
Project Description :
MEP Electrical Works
Status : Completed
Completion : May- 2017

Client Name :
Polo Homes and Lapita
Main Contractor :
Green Dunes Landscape
Project Description :
Swimming Pool Works
Status : Completed
Completion : May- 2017
Polo Homes & Lapita in Dubai
Post Office Tower

Client Name :
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/s. Ali Moosa & Sons Contracting, Sharjah, U.A.E
Project Description :
3 Basements + 4 Podiums + 21 Floors + Service Roof Residential & Commercial Tower at Plot No.P5, Area W4, Abu Dhabi, U.A.E
Status : Completed
Completion : <To be filled>
Commercial Building on Plot no. C-11, Sector E-25, Abu Dhabi

Client Name :
Dr. Engr. Mubarak Saad Al Ahbabi, Abu Dhabi, U.A.E
Main Contractor :
M/s. Arabian Construction Company (ACC), Abu Dhabi, U.A.E
Project Description :
4 Basements + Ground Floor + Mezzanine Floor + 12 Typical Floors + Mechanical/Roof Deck Floor + Gym Floor(Plant Room Level) + Roof Deck Level (Pool Deck Level) Commercial Tower at Plot No.C-11, Sector E-25, Abu Dhabi, U.A.E.
Status : Completed
Completion : <To be filled>
Emirates Palace

Client Name :
Emirates Palace
Main Contractor :
This is a prestigious project, as the client is 5 star hotel.
Project Description :
Rectification of Existing Fire Main Line At Marine Area
Status : Completed
Completion : <To be filled>
Tamouh, Al Reem Island

Client Name :
Tamouh, Al Reem Island
Main Contractor :
China State Construction Engineering Corpn. (ME) LLC
Project Description :
Supply, Installation, Testing & Commissioning of Electrical Works due to Load increase at Tower C2, C3, C10, C10A & C11
Status : Completed
Completion : <To be filled>
Dubai, Outlet Mall Extension


Client Name :
M/s. Al Ahli Holding Group
Main Contractor :
M/s. Al Manhal Engineering Consultants & M/s. Al Ahli Holding Group
Project Description :
G+2 Parking & Service Building, Ground Floor
Status : Completed
Completion : <To be filled>
New Office Fitout at Warfa Square, Abu Dhabi

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
ADDC Refurbishment works at Mussafah, Abu Dhabi

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
MEP works at Amphitheatre, Dubai

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Pipeline Mechanical Works at Haliba Development Project, UAE

Client Name :
< To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Bank One Tower, Abu Dhabi, UAE

Client Name :
FIRST ABU DHABI BANK ONE TOWER
Main Contractor :
<To be filled>
Project Description :
SUPPLY AND INSTALLATION OF WATER PUMP BOOSTER
Status : Completed
Completion : <To be filled>
Crystal Tower, Abu Dhabi

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Emirates Tower, Abu Dhabi

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Crescent Tower

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Moon Tower

Client Name :
<To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Palm Oasis

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : <To be filled>
Dune Tower

Client Name :
<To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Mirage Tower

Client Name :
<To be filled>
Main Contractor :
<To be filled>
Project Description :
<To be filled>
Status : Completed
Completion : <To be filled>
Buliding No: P/105 (G+O+12F) ADCP, Abu Dhabi

Client Name :
Abu Dhabi Commercial Properties
Main Contractor :
Abu Dhabi Commercial Properties
Project Description :
Building No: P/105 (G+O+12F) General Maintenance
Status : Completed
Completion : <To be filled>
Land Mark Tower L16 to L19

Client Name:
M/s. ZADCO, Abu Dhabi, U.A.E
Main Contractor:
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Project Description:
Land Mark Level 16 to Level 19
Project Strength:
This project is being done in a prestigious eye-catching building called “Landmark Tower.” The project is ‘fit-out’ works on Level 16 to Level 19. This building is located in the prominent place of Abu Dhabi City overlooking corniche beach area.
Civil Defense Centre At Abu Dhabi

Client Name :
Abu Dhabi Civil Defense
Main Contractor :
UMNIAH Facility Management
Project Description :
Refurbishment Works
Status : Completed
Completion : March - 2016
Venue-117 Live Dubai Outlet City At Al Ain Road, Dubai, UAE

Client Name :
Mr. Mohammed Naser Ali Khammas
Main Contractor :
M/s. GULF Spring Contracting, Dubai
Project Description :
Supply & Installation of Plumbing Works and Testing & Commissioning
Status : Completed
Completion : March - 2016
Hilton at Ral al Khaimah

Client Name :
RAK Hilton
Main Contractor :
Pact Engineering
Project Description :
MEP Electrical Works
Status : Completed
Completion : May- 2017
Polo Homes & Lapita in Dubai

Client Name :
Polo Homes and Lapita
Main Contractor :
Green Dunes Landscape
Project Description :
Swimming Pool Works
Status : Completed
Completion : May- 2017
Post Office Tower

Client Name :
M/s. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/s. Ali Moosa & Sons Contracting, Sharjah, U.A.E
Project Description :
3 Basements + 4 Podiums + 21 Floors + Service Roof Residential & Commercial Tower at Plot No.P5, Area W4, Abu Dhabi, U.A.E
Status : Completed
Completion : 25/12/2019
Commercial Building on Plot no. C-11, Sector E-25, Abu Dhabi

Client Name :
Dr. Engr. Mubarak Saad Al Ahbabi, Abu Dhabi, U.A.E
Main Contractor :
M/s. Arabian Construction Company (ACC), Abu Dhabi, U.A.E
Project Description :
4 Basements + Ground Floor + Mezzanine Floor + 12 Typical Floors + Mechanical/Roof Deck Floor + Gym Floor(Plant Room Level) + Roof Deck Level (Pool Deck Level) Commercial Tower at Plot No.C-11, Sector E-25, Abu Dhabi, U.A.E.
Status : Completed
Completion : 26/12/2020
Emirates Palace

Client Name :
Emirates Palace
Main Contractor :
Emirates Palace Projects Division
Project Description :
Rectification of Existing Fire Main Line At Marine Area
Status : Completed
Completion : 31/07/2018
Tamouh, Al Reem Island

Client Name :
Tamouh, Al Reem Island
Main Contractor :
China State Construction Engineering Corpn. (ME) LLC
Project Description :
Supply, Installation, Testing & Commissioning of Electrical Works due to Load increase at Tower C2, C3, C10, C10A & C11
Status : Completed
Completion : 31/10/2018
Warfa Square, Abu Dhabi

Client Name :
China Petroleum Engineering & Construction Corporation
Main Contractor :
GEMACO Interiors
Project Description :
New Office Fitout Works
Status : Completed
Completion : 25/12/2019
ADDC Mussafah, Abu Dhabi

Client Name :
Abu Dhabi Distribution Company (ADDC)
Main Contractor :
Abu Hussain Contracting LLC
Project Description :
ADDC Refurbishment Works
Status : Completed
Completion : 31/05/2019
Amphitheatre, Dubai

Client Name :
Al Ahli Holding Group (AAHG)
Main Contractor :
Gulf Spring Contracting LLC
Project Description :
MEP Works
Status : Completed
Completion : 31/01/2018
Haliba Development Project, UAE

Client Name :
ADNOC
Main Contractor :
LNT Hydrocarbon Engineering Limited
Project Description :
Pipeline Mechanical Works
Status : Completed
Completion : 30/11/2018
Bank One Tower, Abu Dhabi, UAE

Client Name :
First Abu Dhabi Bank (FAB)
Main Contractor :
First Abu Dhabi Bank (FAB) FM Division
Project Description :
SUPPLY AND INSTALLATION OF WATER PUMP BOOSTER
Status : Completed
Completion : 31/01/2021
Crystal Tower, Abu Dhabi

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : 30/04/2018
Emirates Tower, Abu Dhabi

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : 30/04/2018
Crescent Tower

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : 30/04/2018
Moon Tower

Client Name :
Foundation Property Management, Abu Dhabi, UAE.
Main Contractor :
Foundation Property Management, Abu Dhabi, UAE.
Project Description :
Facility Management Works
Status : Completed
Completion : 30/04/2018
Palm Oasis

Client Name :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Main Contractor :
M/S. Foundation Property Management, Abu Dhabi, U.A.E
Project Description :
Facility Management Works
Status : Completed
Completion : 30/04/2018
Dune Tower

Client Name :
Foundation Property Management, Abu Dhabi, UAE.
Main Contractor :
Foundation Property Management, Abu Dhabi, UAE.
Project Description :
Facility Management Works
Status : Completed
Completion : 30/04/2018
Mirage Tower

Client Name :
Foundation Property Management, Abu Dhabi, UAE.
Main Contractor :
Foundation Property Management, Abu Dhabi, UAE.
Project Description :
Facility Management Works
Status : Completed
Completion : 30/04/2018
Buliding No: P/105 (G+O+12F) ADCP, Abu Dhabi

Client Name :
Abu Dhabi Commercial Properties
Main Contractor :
Abu Dhabi Commercial Properties
Project Description :
Building No: P/105 (G+O+12F) General Maintenance
Status : Completed
Completion : 22/03/2020
Business Avenue Tower

Client Name :
Foundation Property Management, Abu Dhabi, UAE.
Main Contractor :
Foundation Property Management, Abu Dhabi, UAE.
Project Description :
Facilities Management Works
Status : Completed
Completion : 28/03/2017
Private Villa At Seychelles

Client Name :
DOPA
Main Contractor :
M/s. Reliance Engineering Services, Seychelles
Project Description :
Facilities Management Works
Status : Completed
Completion : 30/04/2018
Bank of Baroda

Client Name :
Bank of Baroda
Main Contractor :
M/s. Trends Electro-Mechanical Works LLC
Project Description :
Facilities Management Works
Status : Completed
Completion : 30/06/2019